Peak shaving reduces a facility’s high power demand; load shifting changes when energy is purchased or used. A commercial battery may support either strategy, but the business case depends on the actual tariff, interval demand, charging opportunity and operating constraints. A large kWh label alone does not establish savings.

Begin with the bill structure and a time-stamped load profile. Then identify the power and energy the battery would need to deliver. Keep backup reserve and business continuity priorities in the same dispatch plan so one objective does not silently consume the energy intended for another.

Define the billing problem first

Strategy Primary question Key evidence
Peak shaving Can battery output reduce the measured billing demand? Demand-charge rules, measurement interval and the highest load events.
Load shifting Can energy move to a more valuable time after losses? Import prices, export value, schedule and round-trip performance.
Backup Which loads must operate when a source fails? Critical circuits, reserve, islanding design and required duration.

Not every account has a separately avoidable demand charge or time-varying energy price. Read the tariff for the actual service and billing period. A generic tariff from another country, voltage class or customer category is not an adequate input.

A worked peak-shaving example

Consider six illustrative 15-minute demand intervals: 80, 90, 120, 110, 90 and 80kW. Suppose the proposed control objective is to cap grid import at 100kW during that period. The battery must deliver 20kW for the 120kW interval and 10kW for the 110kW interval, before allowance for the actual connection and controls.

Six illustrative 15-minute intervals require 20 and 10kW of battery output above a 100kW target, totalling 7.5kWh AC.
The intervals and target are illustrative. Actual tariff demand measurement, charging and PCS limits need review. Open the diagram to view it at full size.

The energy discharged is 20 × 0.25 + 10 × 0.25 = 7.5kWh AC. The highest required battery output is 20kW. This small example demonstrates why a demand event has both a power requirement and an energy duration. A 20kW peak lasting three hours would need a very different energy budget.

The 15-minute interval here is an illustration, not a claim about any particular utility’s billing method. Confirm the actual demand definition, demand ratchets, coincident or non-coincident conditions and the relevant measurement point with the customer’s provider.

Do not create a new peak while charging

The battery needs to replenish its discharged energy. If charging adds demand during another high-load period, the installation could move the peak rather than reduce it. The dispatch plan should include an import constraint, charging schedule and response to changing building loads.

PV charging can help where surplus generation exists, but solar nameplate capacity is not guaranteed surplus. A facility may use nearly all its daytime PV output. Include the actual generation and consumption profiles rather than assuming every sunny hour is available to charge storage.

The System Advisor Model battery-dispatch documentation provides a technical reference for behind-the-meter dispatch approaches. Modelling options are not a guarantee that a selected controller or tariff will deliver the same result.

Load shifting needs a loss-aware value calculation

For a simplified grid-charging example, assume the battery must deliver 20kWh AC later and the AC-to-AC round-trip efficiency is 90%. It would need approximately 22.22kWh of charging energy. Use the complete system’s relevant efficiency, including the basis on which auxiliary loads are handled. Use the round-trip efficiency worksheet to check which meters and auxiliaries belong in that percentage.

If hypothetical low- and high-price rates are 4 and 8 currency units per kWh, charging costs about 88.89 units while avoiding 160 units of later energy purchases. The gross difference is about 71.11 units for that event, before capital, operating, degradation and other costs.

Delivering 20kWh later at 90% AC-to-AC efficiency needs about 22.22kWh of charging energy.
The example uses hypothetical rates of 4 and 8 currency units. The gross difference excludes capital, operating and other costs. Open the diagram to view it at full size.

These rates are arithmetic assumptions, not a Philippine or Malaysian tariff quote. If the higher rate were only 4.4 units, the avoided cost would be 88 units and the same charging energy would already cost more. A price spread is useful only when it exceeds losses and relevant costs. For this energy-only example, a positive gross spread requires the avoided rate to exceed 4 ÷ 0.90, or about 4.44 currency units per delivered kWh, before other costs. This is separate from any demand-charge benefit.

Choose power and energy as separate design inputs

PCS power determines how much demand the system may support at one time, subject to its operating conditions. Battery energy determines how long an approved output can be sustained over the available window. The inverter’s apparent-power rating, power factor and reactive-power requirements also need review.

GINZA’s commercial range lists different nominal energy and PCS platforms. A product labelled 100kWh-class, for example, should not be assumed to have 100kW of output. The 100kWh commercial sizing guide explains the distinction using the published 100.3kWh and 50kVA reference.

GINZA GIB-100KP 100.3kWh commercial energy storage cabinet
Existing GINZA commercial cabinet image. Use the current supplied configuration and engineering documents for the exact project.

Reserve can make two attractive models incompatible

A financial model may assume the battery is fully available for daily peak reduction. A business-continuity plan may require much of that energy to remain unused for an unexpected outage. Both cannot automatically claim the same kWh at the same time.

Define priority rules: minimum protected reserve, permitted discharge during the demand window and the charging plan before the next critical period. Examine what happens after a cloudy day, an unscheduled production run or a grid interruption. The reserve worksheet shows how to express the protected window on a consistent capacity basis.

A controller strategy should also specify the response to stale meter data, communications loss and equipment derating. A model that assumes perfect forecasts and unlimited power can overstate the achievable outcome.

Test the business case against several scenarios

Scenario Question to test
Normal operating month How often are useful peaks or price windows available?
Lower production Does lower demand reduce the battery’s financial use?
Unexpected long peak Does available energy run out before the event ends?
Limited charging Can the bank be ready without causing a new peak?
Reduced retained capacity Can the same objective still be achieved later in service?

Calculate net benefit using the full installed cost, realistic operating days, service costs and the agreed financial method. Do not turn a single favourable event into a fixed annual payback. Avoid adding demand and energy savings that represent the same benefit twice.

The regional storage application and project-evidence review helps distinguish an industrial dispatch enquiry from a household purchase or an auction-stage project. Keep the tariff and interval model here specific to the actual business account.

Check the month, not just the demonstration day

Where a demand charge is based on a monthly maximum, one unhandled event can determine the billed peak even if dispatch works well on most other days. Evaluate the complete billing period, including weekends, abnormal production and the charging schedule. Compare the actual meter data with the control target and identify any intervals when the system was unavailable or energy-limited. This also provides a practical acceptance and monitoring method: retain both the power profile and the reason for each significant departure from the target.

A practical data request for a commercial review

Provide the tariff and bills, an interval demand file with its timezone and units, operating calendar, PV generation data, connection details and critical-load priorities. Include future production changes and any restrictions on grid charging or export.

The engineering team also needs site access, environmental conditions, switchboard and protection information, communications requirements and the responsible parties for controls and utility coordination. Keep the commercial assumptions and the electrical design together through procurement.

Sources and interpretation

The demand intervals, rates, efficiency and dispatch target are hypothetical. SAM documents modelling approaches, not a guarantee for the controller or tariff on a quotation. Assess the actual billing period and measurement definition, include charging demand and protect the reserve assigned to other operating objectives.

Frequently asked questions

Can peak shaving and load shifting run on the same battery?

Potentially, with suitable controls and enough power, energy and charging opportunity. The dispatch rules must allocate capacity between objectives and protect any required backup reserve.

Is more kWh always better for demand reduction?

No. A short peak may be constrained by output power, while a long event needs more energy. Size from the actual interval profile and billing rules.

Does solar charging make stored energy free?

Not automatically. Account for the alternative use or export value of that solar energy, losses and system costs.

Review the GINZA commercial ESS range and send an interval-data and tariff package for a project-specific assessment.